116.07 Powers and duties.

Subdivision 1. Generally. In addition to any powers or duties otherwise prescribed by law and without limiting the same, the pollution control agency shall have the powers and duties hereinafter specified.

Subd. 2. Adoption of standards. The pollution control agency shall improve air quality by promoting, in the most practicable way possible, the use of energy sources and waste disposal methods which produce or emit the least air contaminants consistent with the agency's overall goal of reducing all forms of pollution. The agency shall also adopt standards of air quality, including maximum allowable standards of emission of air contaminants from motor vehicles, recognizing that due to variable factors, no single standard of purity of air is applicable to all areas of the state. In adopting standards the pollution control agency shall give due recognition to the fact that the quantity or characteristics of air contaminants or the duration of their presence in the atmosphere, which may cause air pollution in one area of the state, may cause less or not cause any air pollution in another area of the state, and it shall take into consideration in this connection such factors, including others which it may deem proper, as existing physical conditions, zoning classifications, topography, prevailing wind directions and velocities, and the fact that a standard of air quality which may be proper as to an essentially residential area of the state, may not be proper as to a highly developed industrial area of the state. Such standards of air quality shall be premised upon scientific knowledge of causes as well as effects based on technically substantiated criteria and commonly accepted practices. No local government unit shall set standards of air quality which are more stringent than those set by the pollution control agency.

The pollution control agency shall promote solid waste disposal control by encouraging the updating of collection systems, elimination of open dumps, and improvements in incinerator practices. The agency shall also adopt standards for the control of the collection, transportation, storage, processing, and disposal of solid waste and sewage sludge for the prevention and abatement of water, air, and land pollution, recognizing that due to variable factors, no single standard of control is applicable to all areas of the state. In adopting standards, the pollution control agency shall give due recognition to the fact that elements of control which may be reasonable and proper in densely populated areas of the state may be unreasonable and improper in sparsely populated or remote areas of the state, and it shall take into consideration in this connection such factors, including others which it may deem proper, as existing physical conditions, topography, soils and geology, climate, transportation, and land use. Such standards of control shall be premised on technical criteria and commonly accepted practices.

The pollution control agency shall also adopt standards describing the maximum levels of noise in terms of sound pressure level which may occur in the outdoor atmosphere, recognizing that due to variable factors no single standard of sound pressure is applicable to all areas of the state. Such standards shall give due consideration to such factors as the intensity of noises, the types of noises, the frequency with which noises recur, the time period for which noises continue, the times of day during which noises occur, and such other factors as could affect the extent to which noises may be injurious to human health or welfare, animal or plant life, or property, or could interfere unreasonably with the enjoyment of life or property. In adopting standards, the pollution control agency shall give due recognition to the fact that the quantity or characteristics of noise or the duration of its presence in the outdoor atmosphere, which may cause noise pollution in one area of the state, may cause less or not cause any noise pollution in another area of the state, and it shall take into consideration in this connection such factors, including others which it may deem proper, as existing physical conditions, zoning classifications, topography, meteorological conditions and the fact that a standard which may be proper in an essentially residential area of the state, may not be proper as to a highly developed industrial area of the state. Such noise standards shall be premised upon scientific knowledge as well as effects based on technically substantiated criteria and commonly accepted practices. No local governing unit shall set standards describing the maximum levels of sound pressure which are more stringent than those set by the pollution control agency.

The pollution control agency shall adopt standards for the identification of hazardous waste and for the management, identification, labeling, classification, storage, collection, transportation, processing, and disposal of hazardous waste, recognizing that due to variable factors, a single standard of hazardous waste control may not be applicable to all areas of the state. In adopting standards, the pollution control agency shall recognize that elements of control which may be reasonable and proper in densely populated areas of the state may be unreasonable and improper in sparsely populated or remote areas of the state. The agency shall consider existing physical conditions, topography, soils, and geology, climate, transportation and land use. Standards of hazardous waste control shall be premised on technical knowledge, and commonly accepted practices. No local government unit shall set standards of hazardous waste control which are in conflict or inconsistent with those set by the pollution control agency.

A person who generates less than 100 kilograms of hazardous waste per month is exempt from the agency hazardous waste rules relating to transportation, manifesting, storage, and labeling for photographic fixer and X-ray negative wastes that are hazardous solely because of silver content. Nothing in this paragraph exempts the generator from the agency's rules relating to on-site accumulation or outdoor storage. A political subdivision or other local unit of government may not adopt management requirements that are more restrictive than this paragraph.

Subd. 2a. Exemptions from standards. No standards adopted by any state agency for limiting levels of noise in terms of sound pressure which may occur in the outdoor atmosphere shall apply to (1) segments of trunk highways constructed with federal interstate substitution money, provided that all reasonably available noise mitigation measures are employed to abate noise, (2) an existing or newly constructed segment of a highway, provided that all reasonably available noise mitigation measures, as approved by the commissioners of the department of transportation and pollution control agency, are employed to abate noise, (3) skeet, trap or shooting sports clubs, or (4) motor vehicle race events conducted at a facility specifically designed for that purpose that was in operation on or before July 1, 1983. Nothing herein shall prohibit a local unit of government or a public corporation with the power to make rules for the government of its real property from regulating the location and operation of skeet, trap or shooting sports clubs, or motor vehicle race events conducted at a facility specifically designed for that purpose that was in operation on or before July 1, 1983.

Subd. 3. Administrative rules. Pursuant and subject to the provisions of chapter 14, and the provisions hereof, the pollution control agency may adopt, amend, and rescind rules governing its own administration and procedure and its staff and employees.

Subd. 4. Rules and standards. Pursuant and subject to the provisions of chapter 14, and the provisions hereof, the pollution control agency may adopt, amend and rescind rules and standards having the force of law relating to any purpose within the provisions of Laws 1967, chapter 882, for the prevention, abatement, or control of air pollution. Any such rule or standard may be of general application throughout the state, or may be limited as to times, places, circumstances, or conditions in order to make due allowance for variations therein. Without limitation, rules or standards may relate to sources or emissions of air contamination or air pollution, to the quality or composition of such emissions, or to the quality of or composition of the ambient air or outdoor atmosphere or to any other matter relevant to the prevention, abatement, or control of air pollution.

Pursuant and subject to the provisions of chapter 14, and the provisions hereof, the pollution control agency may adopt, amend, and rescind rules and standards having the force of law relating to any purpose within the provisions of Laws 1969, chapter 1046, for the collection, transportation, storage, processing, and disposal of solid waste and the prevention, abatement, or control of water, air, and land pollution which may be related thereto, and the deposit in or on land of any other material that may tend to cause pollution. The agency shall adopt such rules and standards for sewage sludge, addressing the intrinsic suitability of land, the volume and rate of application of sewage sludge of various degrees of intrinsic hazard, design of facilities, and operation of facilities and sites. Any such rule or standard may be of general application throughout the state or may be limited as to times, places, circumstances, or conditions in order to make due allowance for variations therein. Without limitation, rules or standards may relate to collection, transportation, processing, disposal, equipment, location, procedures, methods, systems or techniques or to any other matter relevant to the prevention, abatement or control of water, air, and land pollution which may be advised through the control of collection, transportation, processing, and disposal of solid waste and sewage sludge, and the deposit in or on land of any other material that may tend to cause pollution. By January 1, 1983, the rules for the management of sewage sludge shall include an analysis of the sewage sludge determined by the commissioner of agriculture to be necessary to meet the soil amendment labeling requirements of section 18C.215.

Pursuant and subject to the provisions of chapter 14, and the provisions hereof, the pollution control agency may adopt, amend and rescind rules and standards having the force of law relating to any purpose within the provisions of Laws 1971, chapter 727, for the prevention, abatement, or control of noise pollution. Any such rule or standard may be of general application throughout the state, or may be limited as to times, places, circumstances or conditions in order to make due allowances for variations therein. Without limitation, rules or standards may relate to sources or emissions of noise or noise pollution, to the quality or composition of noises in the natural environment, or to any other matter relevant to the prevention, abatement, or control of noise pollution.

As to any matters subject to this chapter, local units of government may set emission regulations with respect to stationary sources which are more stringent than those set by the pollution control agency.

Pursuant to chapter 14, the pollution control agency may adopt, amend, and rescind rules and standards having the force of law relating to any purpose within the provisions of this chapter for generators of hazardous waste, the management, identification, labeling, classification, storage, collection, treatment, transportation, processing, and disposal of hazardous waste and the location of hazardous waste facilities. A rule or standard may be of general application throughout the state or may be limited as to time, places, circumstances, or conditions. In implementing its hazardous waste rules, the pollution control agency shall give high priority to providing planning and technical assistance to hazardous waste generators. The agency shall assist generators in investigating the availability and feasibility of both interim and long-term hazardous waste management methods. The methods shall include waste reduction, waste separation, waste processing, resource recovery, and temporary storage.

The pollution control agency shall give highest priority in the consideration of permits to authorize disposal of diseased shade trees by open burning at designated sites to evidence concerning economic costs of transportation and disposal of diseased shade trees by alternative methods.

Subd. 4a. Permits. (a) The pollution control agency may issue, continue in effect or deny permits, under such conditions as it may prescribe for the prevention of pollution, for the emission of air contaminants, or for the installation or operation of any emission facility, air contaminant treatment facility, treatment facility, potential air contaminant storage facility, or storage facility, or any part thereof, or for the sources or emissions of noise pollution.

The pollution control agency may also issue, continue in effect or deny permits, under such conditions as it may prescribe for the prevention of pollution, for the storage, collection, transportation, processing, or disposal of waste, or for the installation or operation of any system or facility, or any part thereof, related to the storage, collection, transportation, processing, or disposal of waste.

The pollution control agency may revoke or modify any permit issued under this subdivision and section 116.081 whenever it is necessary, in the opinion of the agency, to prevent or abate pollution.

(b) The pollution control agency has the authority for approval over the siting, expansion, or operation of a solid waste facility with regard to environmental issues. However, the agency's issuance of a permit does not release the permittee from any liability, penalty, or duty imposed by any applicable county ordinances. Nothing in this chapter precludes, or shall be construed to preclude, a county from enforcing land use controls, regulations, and ordinances existing at the time of the permit application and adopted pursuant to sections 366.10 to 366.181, 394.21 to 394.37, or 462.351 to 462.365, with regard to the siting, expansion, or operation of a solid waste facility.

Subd. 4b. Permits; hazardous waste facilities. (a) The agency shall provide to the office of environmental assistance established in section 115A.055, copies of each permit application for a hazardous waste facility immediately upon its submittal to the agency. The agency shall request recommendations on each permit application from the office and shall consult with the office on the agency's intended disposition of the recommendations. Except as otherwise provided in sections 115A.18 to 115A.30, the agency shall commence any environmental review required under chapter 116D within 120 days of its acceptance of a completed permit application. The agency shall respond to a permit application for a hazardous waste facility within 120 days following a decision not to prepare environmental documents or following the acceptance of a negative declaration notice or an environmental impact statement. Except as otherwise provided in sections 115A.18 to 115A.30, within 60 days following the submission of a final permit application for a hazardous waste facility, unless a time extension is agreed to by the applicant, the agency shall issue or deny all permits needed for the construction of the proposed facility.

(b) The agency shall promulgate rules pursuant to chapter 14 for all hazardous waste facilities. After the report of the office of environmental assistance required by section 115A.08, subdivision 5a, has been submitted to the legislature, the agency shall review its rules for hazardous waste facilities and shall consider whether any of the rules should be modified or if new rules should be adopted based on the recommendations in the report. The rules shall require:

(1) contingency plans for all hazardous waste facilities which provide for effective containment and control in any emergency condition;

(2) the establishment of a mechanism to assure that money to cover the costs of closure and postclosure monitoring and maintenance of hazardous waste facilities will be available;

(3) the maintenance of liability insurance by the owner or operator of hazardous waste facilities during the operating life of the facility.

Subd. 4c. Repealed, 1983 c 373 s 72

Subd. 4d. Permit fees. (a) The agency may collect permit fees in amounts not greater than those necessary to cover the reasonable costs of reviewing and acting upon applications for agency permits and implementing and enforcing the conditions of the permits pursuant to agency rules. Permit fees shall not include the costs of litigation. The agency shall adopt rules under section 16A.1285 establishing a system for charging permit fees collected under this subdivision. The fee schedule must reflect reasonable and routine permitting, implementation, and enforcement costs. The agency may impose an additional enforcement fee to be collected for a period of up to two years to cover the reasonable costs of implementing and enforcing the conditions of a permit under the rules of the agency. Any money collected under this paragraph shall be deposited in the special revenue account.

(b) Notwithstanding paragraph (a), and section 16A.1285, subdivision 2, the agency shall collect an annual fee from the owner or operator of all stationary sources, emission facilities, emissions units, air contaminant treatment facilities, treatment facilities, potential air contaminant storage facilities, or storage facilities subject to the requirement to obtain a permit under subchapter V of the federal Clean Air Act, United States Code, title 42, section 7401 et seq., or section 116.081. The annual fee shall be used to pay for all direct and indirect reasonable costs, including attorney general costs, required to develop and administer the permit program requirements of subchapter V of the federal Clean Air Act, United States Code, title 42, section 7401 et seq., and sections of this chapter and the rules adopted under this chapter related to air contamination and noise. Those costs include the reasonable costs of reviewing and acting upon an application for a permit; implementing and enforcing statutes, rules, and the terms and conditions of a permit; emissions, ambient, and deposition monitoring; preparing generally applicable regulations; responding to federal guidance; modeling, analyses, and demonstrations; preparing inventories and tracking emissions; and providing information to the public about these activities.

(c) The agency shall adopt fee rules in accordance with the procedures in section 16A.1285, subdivision 5, that will result in the collection, in the aggregate, from the sources listed in paragraph (b), of the following amounts:

(1) an amount not less than $25 per ton of each volatile organic compound; pollutant regulated under United States Code, title 42, section 7411 or 7412 (section 111 or 112 of the federal Clean Air Act); and each pollutant, except carbon monoxide, for which a national primary ambient air quality standard has been promulgated; and

(2) the agency fee rules may also result in the collection, in the aggregate, from the sources listed in paragraph (b), of an amount not less than $25 per ton of each pollutant not listed in clause (1) that is regulated under this chapter or air quality rules adopted under this chapter.

The agency must not include in the calculation of the aggregate amount to be collected under the fee rules any amount in excess of 4,000 tons per year of each air pollutant from a source.

(d) To cover the reasonable costs described in paragraph (b), the agency shall provide in the rules promulgated under paragraph (c) for an increase in the fee collected in each year by the percentage, if any, by which the Consumer Price Index for the most recent calendar year ending before the beginning of the year the fee is collected exceeds the Consumer Price Index for the calendar year 1989. For purposes of this paragraph the Consumer Price Index for any calendar year is the average of the Consumer Price Index for all-urban consumers published by the United States Department of Labor, as of the close of the 12-month period ending on August 31 of each calendar year. The revision of the Consumer Price Index that is most consistent with the Consumer Price Index for calendar year 1989 shall be used.

(e) Any money collected under paragraphs (b) to (d) must be deposited in an air quality account in the environmental fund and must be used solely for the activities listed in paragraph (b).

(f) Persons who wish to construct or expand an air emission facility may offer to reimburse the agency for the costs of staff overtime or consultant services needed to expedite permit review. The reimbursement shall be in addition to fees imposed by paragraphs (a) to (d). When the agency determines that it needs additional resources to review the permit application in an expedited manner, and that expediting the review would not disrupt air permitting program priorities, the agency may accept the reimbursement. Reimbursements accepted by the agency are appropriated to the agency for the purpose of reviewing the permit application. Reimbursement by a permit applicant shall precede and not be contingent upon issuance of a permit and shall not affect the agency's decision on whether to issue or deny a permit, what conditions are included in a permit, or the application of state and federal statutes and rules governing permit determinations.

Subd. 4e. Hazardous waste processing facilities; agreements; financial responsibility. When the agency issues a permit for a facility for the processing of hazardous waste, the agency may approve as a condition of the permit an agreement by which the permittee indemnifies the generators of hazardous waste accepted by the facility for part or all of any liability which may accrue to the generators as a result of a release or threatened release of a hazardous waste from the facility. The agency may approve an agreement under this subdivision only if the agency determines that the permittee has demonstrated financial responsibility to carry out the agreement during the term of the permit. If a generator of hazardous waste accepted by a permitted processing facility is held liable for costs or damages arising out of a release of a hazardous waste from the facility, and the permittee is subject to an agreement approved under this subdivision, the generator is liable to the extent that the costs or damages were not paid under this agreement.

Subd. 4f. Closure and postclosure responsibility and liability. An operator or owner of a facility is responsible for closure of the facility and postclosure care relating to the facility. If an owner or operator has failed to provide the required closure or postclosure care of the facility the agency may take the actions. The owner or operator is liable for the costs of the required closure and postclosure care taken by the agency.

Subd. 4g. Closure and postclosure rules. The agency shall adopt rules establishing requirements for the closure of solid waste disposal facilities and for the postclosure care of closed facilities. The rules apply to all solid waste disposal facilities in operation at the time the rules are effective. The rules must provide standards and procedures for closing disposal facilities and for the care, maintenance, and monitoring of the facilities after closure that will prevent, mitigate, or minimize the threat to public health and the environment posed by closed disposal facilities.

Subd. 4h. Financial responsibility rules. (a) The agency shall adopt rules requiring the operator or owner of a solid waste disposal facility to submit to the agency proof of the operator's or owner's financial capability to provide reasonable and necessary response during the operating life of the facility and for 30 years after closure for a mixed municipal solid waste disposal facility or for a minimum of 20 years after closure, as determined by agency rules, for any other solid waste disposal facility, and to provide for the closure of the facility and postclosure care required under agency rules. Proof of financial responsibility is required of the operator or owner of a facility receiving an original permit or a permit for expansion after adoption of the rules. Within 180 days of the effective date of the rules or by July 1, 1987, whichever is later, proof of financial responsibility is required of an operator or owner of a facility with a remaining capacity of more than five years or 500,000 cubic yards that is in operation at the time the rules are adopted. Compliance with the rules and the requirements of paragraph (b) is a condition of obtaining or retaining a permit to operate the facility.

(b) A municipality, as defined in section 475.51, subdivision 2, including a sanitary district, that owns or operates a solid waste disposal facility that was in operation on May 15, 1989, may meet its financial responsibility for all or a portion of the contingency action portion of the reasonable and necessary response costs at the facility by pledging its full faith and credit to meet its responsibility.

The pledge must be made in accordance with the requirements in chapter 475 for issuing bonds of the municipality, and the following additional requirements:

(1) The governing body of the municipality shall enact an ordinance that clearly accepts responsibility for the costs of contingency action at the facility and that reserves, during the operating life of the facility and for the time period required in paragraph (a) after closure, a portion of the debt limit of the municipality, as established under section 475.53 or other law, that is equal to the total contingency action costs.

(2) The municipality shall require that all collectors that haul to the facility implement a plan for reducing solid waste by using volume-based pricing, recycling incentives, or other means.

(3) When a municipality opts to meet a portion of its financial responsibility by relying on its authority to issue bonds, it shall also begin setting aside in a dedicated long-term care trust fund money that will cover a portion of the potential contingency action costs at the facility, the amount to be determined by the agency for each facility based on at least the amount of waste deposited in the disposal facility each year, and the likelihood and potential timing of conditions arising at the facility that will necessitate response action. The agency may not require a municipality to set aside more than five percent of the total cost in a single year.

(4) A municipality shall have and consistently maintain an investment grade bond rating as a condition of using bonding authority to meet financial responsibility under this section.

(5) The municipality shall file with the commissioner of revenue its consent to have the amount of its contingency action costs deducted from state aid payments otherwise due the municipality and paid instead to the environmental response, compensation, and compliance account created in section 115B.20, if the municipality fails to conduct the contingency action at the facility when ordered by the agency. If the agency notifies the commissioner that the municipality has failed to conduct contingency action when ordered by the agency, the commissioner shall deduct the amounts indicated by the agency from the state aids in accordance with the consent filed with the commissioner.

(6) The municipality shall file with the agency written proof that it has complied with the requirements of paragraph (b).

(c) The method for proving financial responsibility under paragraph (b) may not be applied to a new solid waste disposal facility or to expansion of an existing facility, unless the expansion is a vertical expansion. Vertical expansions of qualifying existing facilities cannot be permitted for a duration of longer than three years.

Subd. 4i. Civil penalties. The civil penalties of sections 115.071 and 116.072 apply to any person in violation of the rules adopted under subdivision 4g or 4h.

Subd. 4j. Permits; solid waste facilities. (a) The agency may not issue a permit for new or additional capacity for a mixed municipal solid waste resource recovery or disposal facility as defined in section 115A.03 unless each county using or projected in the permit to use the facility has in place a solid waste management plan approved under section 115A.46 or 473.803 and amended as required by section 115A.96, subdivision 6. The agency shall issue the permit only if the capacity of the facility is consistent with the needs for resource recovery or disposal capacity identified in the approved plan or plans. Consistency must be determined by the office of environmental assistance. Plans approved before January 1, 1990, need not be revised if the capacity sought in the permit is consistent with the approved plan or plans.

(b) The agency shall require as part of the permit application for a waste incineration facility identification of preliminary plans for ash management and ash leachate treatment or ash utilization. The permit issued by the agency must include requirements for ash management and ash leachate treatment.

(c) Within 30 days of receipt by the agency of a permit application for a solid waste facility, the commissioner shall notify the applicant in writing whether the application is complete and if not, what items are needed to make it complete, and shall give an estimate of the time it will take to process the application. Within 180 days of receipt of a completed application, the agency shall approve, disapprove, or delay decision on the application, with reasons for the delay, in writing.

Subd. 4k. Household hazardous waste and other problem materials management. (a) The agency shall adopt rules to require the owner or operator of a solid waste disposal facility or resource recovery facility to submit to the agency and to each county using or projected to use the facility a management plan for the separation of household hazardous waste and other problem materials from solid waste prior to disposal or processing and for the proper management of the waste. The rules must require that the plan be developed in coordination with each county using, or projected to use, the facility. The plan must not be inconsistent with the plan developed under section 115A.956, subdivision 2, and must include:

(1) identification of materials that are problem materials, as defined in section 115A.03, subdivision 24a, for the facility;

(2) participation in public education activities on management of household hazardous waste and other problem materials in the facility's service area;

(3) a strategy for reduction of household hazardous waste and other problem materials entering the facility; and

(4) a plan for the storage and proper management of separated household hazardous waste and other problem materials.

(b) By September 30, 1992, the owner or operator of a facility shall implement the elements of the plan required in paragraph (a) relating to household hazardous waste management. After that date, the agency may not grant or renew a permit for a facility until the agency has:

(1) reviewed the elements of the facility's plan relating to household hazardous waste management;

(2) directed the applicant or permittee to make changes to these elements as necessary to comply with the plan requirements under paragraph (a); and

(3) included a requirement to implement the elements as a condition of the issued or renewed permit.

(c) By September 30, 1993, the owner or operator of a facility shall implement the elements of the plan required in paragraph (a) relating to problem materials management. After that date, the agency may not grant or renew a permit for a facility until the agency has:

(1) reviewed the elements of the facility's plan relating to problem materials management;

(2) directed the applicant or permittee to make changes to these elements as necessary to comply with the plan requirements under paragraph (a); and

(3) included a requirement to implement the elements as a condition of the issued or renewed permit.

Subd. 5. Variances. The pollution control agency may grant variances from its rules as provided in section 14.05, subdivision 4, in order to avoid undue hardship and to promote the effective and reasonable application and enforcement of laws, rules, and standards for prevention, abatement and control of water, air, noise, and land pollution. The variance rules shall provide for notice and opportunity for hearing before a variance is granted.

A local government unit authorized by contract with the pollution control agency pursuant to section 116.05 to exercise administrative powers under this chapter may grant variances after notice and public hearing from any ordinance, rule, or standard for prevention, abatement, or control of water, air, noise and land pollution, adopted pursuant to said administrative powers and under the provisions of this chapter.

Subd. 6. Pollution control agency; exercise of powers. In exercising all its powers the pollution control agency shall give due consideration to the establishment, maintenance, operation and expansion of business, commerce, trade, industry, traffic, and other economic factors and other material matters affecting the feasibility and practicability of any proposed action, including, but not limited to, the burden on a municipality of any tax which may result therefrom, and shall take or provide for such action as may be reasonable, feasible, and practical under the circumstances.

Subd. 7. Counties; processing of applications for animal lot permits. Any Minnesota county board may, by resolution, with approval of the pollution control agency, assume responsibility for processing applications for permits required by the pollution control agency under this section for livestock feedlots, poultry lots or other animal lots. The responsibility for permit application processing, if assumed by a county, may be delegated by the county board to any appropriate county officer or employee.

(a) For the purposes of this subdivision, the term "processing" includes:

(1) the distribution to applicants of forms provided by the pollution control agency;

(2) the receipt and examination of completed application forms, and the certification, in writing, to the pollution control agency either that the animal lot facility for which a permit is sought by an applicant will comply with applicable rules and standards, or, if the facility will not comply, the respects in which a variance would be required for the issuance of a permit; and

(3) rendering to applicants, upon request, assistance necessary for the proper completion of an application.

(b) For the purposes of this subdivision, the term "processing" may include, at the option of the county board, issuing, denying, modifying, imposing conditions upon, or revoking permits pursuant to the provisions of this section or rules promulgated pursuant to it, subject to review, suspension, and reversal by the pollution control agency. The pollution control agency shall, after written notification, have 15 days to review, suspend, modify, or reverse the issuance of the permit. After this period, the action of the county board is final, subject to appeal as provided in chapter 14.

(c) For the purpose of administration of rules adopted under this subdivision, the commissioner and the agency may provide exceptions for cases where the owner of a feedlot has specific written plans to close the feedlot within five years. These exceptions include waiving requirements for major capital improvements.

(d) For purposes of this subdivision, a discharge caused by an extraordinary natural event such as a precipitation event of greater magnitude than the 25-year, 24-hour event, tornado, or flood in excess of the 100-year flood is not a "direct discharge of pollutants."

(e) In adopting and enforcing rules under this subdivision, the commissioner shall cooperate closely with other governmental agencies.

(f) The pollution control agency shall work with the Minnesota extension service, the department of agriculture, the board of water and soil resources, producer groups, local units of government, as well as with appropriate federal agencies such as the Soil Conservation Service and the Agricultural Stabilization and Conservation Service, to notify and educate producers of rules under this subdivision at the time the rules are being developed and adopted and at least every two years thereafter.

(g) The pollution control agency shall adopt rules governing the issuance and denial of permits for livestock feedlots, poultry lots or other animal lots pursuant to this section. A feedlot permit is not required for livestock feedlots with more than ten but less than 50 animal units; provided they are not in shoreland areas. These rules apply both to permits issued by counties and to permits issued by the pollution control agency directly.

(h) The pollution control agency shall exercise supervising authority with respect to the processing of animal lot permit applications by a county.

Subd. 8. Public information. The agency may publish, broadcast, or distribute information pertaining to agency activities, laws, rules, and standards.

Subd. 9. Orders; investigations. The agency shall have the following powers and duties for the enforcement of any provision of this chapter and chapter 114C, relating to air contamination or waste:

(a) to adopt, issue, reissue, modify, deny, revoke, enter into or enforce reasonable orders, schedules of compliance and stipulation agreements;

(b) to require the owner or operator of any emission facility, air contaminant treatment facility, potential air contaminant storage facility, or any system or facility related to the storage, collection, transportation, processing, or disposal of waste to establish and maintain records; to make reports; to install, use, and maintain monitoring equipment or methods; and to make tests, including testing for odor where a nuisance may exist, in accordance with methods, at locations, at intervals, and in a manner as the agency shall prescribe; and to provide other information as the agency may reasonably require;

(c) to conduct investigations, issue notices, public and otherwise, and order hearings as it may deem necessary or advisable for the discharge of its duties under this chapter and chapter 114C, including but not limited to the issuance of permits; and to authorize any member, employee, or agent appointed by it to conduct the investigations and issue the notices.

Subd. 10. Solid waste generator assessments. (a) For the purposes of this subdivision:

(1) "assessed waste" means mixed municipal solid waste as defined in section 115A.03, subdivision 21, infectious waste as defined in section 116.76, subdivision 12, pathological waste as defined in section 116.76, subdivision 14, industrial waste as defined in section 115A.03, subdivision 13a, and construction debris as defined in section 115A.03, subdivision 7; provided that all types of assessed waste listed in this clause do not include:

(i) materials that are separated for recycling by the generator and that are collected separately from other waste and delivered to a waste facility for the purpose of recycling and recycled;

(ii) materials that are separated for recycling by the generator, collected and delivered to a waste facility that recycles at least 85 percent of its waste, and are collected with mixed municipal solid waste that is segregated in leakproof bags, provided that the mixed municipal solid waste does not exceed five percent of the total weight of the materials delivered to the facility and is ultimately delivered to a facility designated under sections 115A.80 to 115A.893; and

(iii) waste generated outside of Minnesota;

(2) "noncompacted cubic yard" means a loose cubic yard of assessed waste;

(3) "nonresidential customer" means:

(i) an owner or operator of a business, including a home operated business, industry, church, nursing home, nonprofit organization, school, or any other commercial or institutional enterprise;

(ii) an owner of a building or site containing multiple residences, including a townhome or manufactured home park, where no resident has separate trash pickup, and no resident is separately assessed for such service; and

(iii) any other generator of assessed waste that is not a residential customer as defined in clause (6);

(4) "periodic waste collection" means each time a waste container is emptied by the person that collects the assessed waste;

(5) "person that collects assessed waste" means each person that is required to pay sales tax on solid waste collection services under section 297A.45, or would pay sales tax under that section if the assessed waste was mixed municipal solid waste; and

(6) "residential customer" means:

(i) a detached single family residence that generates only household mixed municipal solid waste; and

(ii) a person residing in a building or at a site containing multiple residences, including a townhome or a manufactured home park, where each resident either (A) is separately assessed for waste collection or (B) has separate waste collection for each resident, even if the resident pays to the owner or an association a monthly maintenance fee which includes the expense of waste collection, and the owner or association pays the waste collector for waste collection in one lump sum.

(b) A person that collects assessed waste shall collect and remit to the commissioner of revenue a solid waste generator assessment from each of the person's customers as provided in paragraphs (c) and (d). A waste management facility that accepts assessed waste shall collect and remit to the commissioner of revenue the solid waste assessment as provided in paragraph (e).

(c) Except as provided in paragraph (f), the amount of the assessment for each residential customer is $2 per year. Each person that collects assessed waste shall collect the assessment annually from each residential customer that is receiving mixed municipal solid waste collection service on July 1 of each year and shall remit the amount actually collected along with the person's first remittance of the sales tax on solid waste collection services, described in section 297A.45, made after October 1 of each year. For buildings or sites that contain multiple residences that are not separately billed for collection services, the person who collects assessed waste shall collect the assessment for all the residences from the person who is billed for the collection service. Any amount of the assessment that is received by the person that collects assessed waste after October 1 of each year must be remitted along with the person's next remittance of sales tax after receipt of the assessment.

(d)(1) Except as provided in clause (2), the amount of the assessment for each nonresidential customer is 60 cents per noncompacted cubic yard of periodic waste collection capacity purchased by the customer, based on the size of the container for the assessed waste. For a residential customer that generates assessed waste that is not mixed municipal solid waste, the amount of the assessment is 60 cents per noncompacted cubic yard of collection capacity purchased for the waste that is not mixed municipal solid waste, based on the size of the container for the waste. If the capacity purchased is for compacted cubic yards of mixed municipal solid waste, the noncompacted capacity purchased is based on the compaction ratio of 3:1. The commissioner of revenue, after consultation with the commissioner of the pollution control agency, shall determine, and may publish by notice, compaction rates for other types of waste where they exist and conversion schedules for waste that is managed by measurements other than cubic yards. Each person that collects assessed waste shall collect the assessment from each nonresidential customer as part of each statement for payment of waste collection charges and shall remit the amount actually collected along with the next remittance of sales tax after receipt of the assessment.

(2) The assessment for nonresidential customers for the mixed municipal solid waste that is collected with source-separated recyclable materials as described in paragraph (a), clause (1), item (ii), is three-tenths of a cent per gallon. The customer must pay by purchasing specific collection bags or stickers that include the cost of the collection service and assessment.

(e) A person who transports assessed waste generated by that person or by another person without compensation shall pay an assessment of 60 cents per noncompacted cubic yard or the equivalent to the operator of the waste management facility to which the waste is delivered. The operator shall remit the assessments actually collected under this paragraph to the commissioner of revenue. This subdivision does not apply to a person who transports industrial waste generated by that person to a facility owned and operated by that person.

(f) The amount of the assessment for each residential customer that is subject to a mixed municipal solid waste collection service for which the customer pays, based on the volume of waste collected, by purchasing specific collection bags or stickers from the waste collector, municipality, or other vendor is either:

(1) determined by a method developed by the waste collector or municipality and approved by the commissioner of revenue, which yields the equivalent of approximately a $2 annual assessment per household; or

(2) three cents per each 35 gallon unit or less. If the per unit fee method under this clause is used, it is the responsibility of the waste collector or the municipality who is selling the bags or stickers to remit the amount of the assessment to the department of revenue, according to a payment schedule provided by the commissioner of revenue. The collection service and assessment under this clause shall be included in the price of the bag or sticker.

(g) The commissioner of revenue shall redesign sales tax forms for persons that collect assessed waste to accommodate payment of the assessment. The amounts remitted under this subdivision must be deposited in the state treasury and credited to the solid waste fund established in section 115B.42.

(h) For persons that collect assessed waste and operators of waste management facilities who are required to collect the solid waste generator assessments under this subdivision, and persons who are required to remit the assessment under paragraph (f), and who do not collect and remit the sales tax on solid waste collection services under section 297A.45, the commissioner of revenue shall determine when and in what manner the persons and operators must remit the assessment amounts actually collected.

(i) For the purposes of this subdivision, the requirement to "collect" the solid waste generator assessment under paragraph (b) means that the person to whom the requirement applies shall:

(i) include the amount of the assessment in the appropriate statement of charges for waste collection services and in any action to enforce payment on delinquent accounts;

(ii) accurately account for assessments received;

(iii) indicate to generators that payment of the assessment by the waste generator is required by law and inform generators, using information supplied by the commissioner of the agency, of the purposes for which revenue from the assessment will be spent; and

(iv) cooperate fully with the commissioner of revenue to identify generators of assessed waste who fail to remit payment of the assessment.

(j) The audit, penalty, enforcement, and administrative provisions applicable to taxes imposed under chapter 297A apply to the assessments imposed under this subdivision.

(k) If less than $25,000,000 is projected to be available for new encumbrances in any fiscal year after fiscal year 1996 from all existing dedicated revenue sources for landfill cleanup and reimbursement costs under sections 115B.39 to 115B.46, by April 1 before the next fiscal year in which the shortfall is projected the commissioner of the agency shall certify to the commissioner of revenue the amount of the shortfall. To provide for the shortfall, the commissioner of revenue shall increase the assessment under paragraphs (d) and (e) by an amount sufficient to generate revenue equal to the amount of the shortfall effective the following July 1 and shall provide notice of the increased assessment by May 1 following certification to persons who are required to collect and remit the solid waste generator assessments under this subdivision.

Subd. 11. Permits; landfarming contaminated soil. (a) If the agency receives an application for a permit to spread soil contaminated by a harmful substance as defined in section 115B.25, subdivision 7a, on land in an organized or unorganized township other than the township of origin of the soil, the agency must notify the board of the organized township, or the county board of the unorganized township where the spreading would occur at least 60 days prior to issuing the permit.

(b) The agency must not issue a permit to spread contaminated soil on land outside the township of origin if, by resolution, the township board of the organized township, or the county board of the unorganized township where the soil is to be spread requests that the agency not issue a permit.

HIST: 1967 c 882 s 7; 1969 c 1046 s 5-7; 1971 c 727 s 3-5; 1971 c 904 s 1; 1973 c 412 s 13; 1973 c 573 s 1; 1973 c 733 s 1; 1974 c 346 s 2-4; 1974 c 483 s 5-7; 1976 c 76 s 4; 1977 c 90 s 10; 1979 c 304 s 1; 1980 c 564 art 11 s 5-10; 1980 c 614 s 123; 1980 c 615 s 60; 1981 c 352 s 27,28; 1982 c 424 s 130; 1982 c 425 s 17; 1982 c 458 s 2; 1982 c 569 s 19; 1983 c 247 s 51; 1983 c 301 s 112-114; 1983 c 373 s 44,45; 1984 c 640 s 32; 1984 c 644 s 49; 1985 c 248 s 70; 1985 c 274 s 14; 1Sp1985 c 13 s 233; 1986 c 425 s 28; 1987 c 348 s 30; 1989 c 131 s 7; 1989 c 276 s 1; 1989 c 325 s 48; 1989 c 335 art 1 s 269; 1Sp1989 c 1 art 20 s 19; 1990 c 426 art 2 s 1; 1990 c 604 art 10 s 6; 1991 c 199 art 2 s 1; 1991 c 254 art 2 s 37; 1991 c 291 art 21 s 3; 1991 c 303 s 4,5; 1991 c 337 s 55; 1991 c 347 art 1 s 8,18; 1992 c 546 s 2; 1992 c 593 art 1 s 31; 1993 c 172 s 77; 1994 c 585 s 32; 1994 c 619 s 8; 1994 c 632 art 2 s 31; 1994 c 637 s 1; 1994 c 639 art 3 s 3; 1995 c 111 s 1; 1995 c 220 s 104,130; 1995 c 233 art 1 s 7,8; art 2 s 49; 1995 c 247 art 1 s 37,38; art 2 s 54; 1995 c 250 s 1; 1995 c 265 art 2 s 14; 1996 c 305 art 1 s 28; art 2 s 25; 1996 c 437 s 20; 1996 c 470 s 19

Copyright 1996 by the Office of Revisor of Statutes, State of Minnesota.